A process-data diagram (PDD), also called a process-deliverable diagram, is a diagram that shows a method, a way of working, as two linked halves. On the left, an adapted UML activity diagram shows the activities of the method and their order. On the right, an adapted UML class diagram shows the "concepts": the deliverables those activities produce and how they relate. Dotted arrows connect each activity to what it produces. The notation was developed in the mid-2000s by Inge van de Weerd, Sjaak Brinkkemper and colleagues at Utrecht University in the Netherlands, building on a proposal by Motoshi Saeki, as a tool for method engineering: analysing existing development methods, storing their parts, and assembling new methods from those parts. This page explains where it came from, the notation in detail, how it has been used, how it compares with related notations, and its limits, using the original technical reports and papers.
AI disclosure. This page was researched and drafted by an AI assistant for Apiary from an earlier unsourced local draft. Sources were opened and read on 27 November 2026: the full text of two Utrecht University technical reports (2005 and 2010) and an Utrecht/Valencia arXiv report (2024 version), and the abstracts of the 2006 journal paper, the 2009 book chapter and related works. The page has not been reviewed by a human expert. Worked examples are labeled hypothetical.
A note on the earlier draft. The local draft described the PDD as a general-purpose business tool for "data lineage" in finance, healthcare, manufacturing and government, and listed commercial diagramming products said to support it. None of the sources read for this page describe it that way. In the literature it is a meta-modeling notation, a diagram of a method (for example, the steps and documents of a software-requirements process), used mainly in information-systems and method-engineering research. The industry table and tool list were dropped; the two tools the sources do mention (Microsoft Visio and MetaEdit+) are covered in Section 6. The draft also suggested the notation "arose as practitioners recognized the need"; the sources give it a specific academic origin (Section 2). Its "Apiary" framing was removed.
1. What a process-data diagram is
1.1 Two diagrams, one picture
Van de Weerd's 2005 technical report states the core idea in one sentence: "A process-data diagram consists of two integrated diagrams. The left-hand side of the diagram is based on a UML activity diagram, and the right-hand side of the diagram is based on a UML class diagram" (van de Weerd 2005, UU-CS-2005-043).
The left side is the meta-process model: what people do, step by step. The right side is the meta-data model: the things they produce, such as documents, models and lists, and how those things are made up of each other. The link between them is simple: "Each action or activity results in a concept. They are connected with a dotted arrow to the produced artifacts" (van de Weerd 2005).
1.2 Why "meta"
The diagram does not model a particular software system or a particular project. It models the method used to build systems. Van de Weerd describes it as "a meta-modeling technique" used "to reveal the relations between activities (the process) and artifacts (the data produced in the process)" (van de Weerd 2005).
Editorial context: if a class diagram of a library system shows BOOK, MEMBER and LOAN, a PDD of the method used to design that system might show the activity "Define use cases" producing a USE CASE MODEL that contains ACTORS and USE CASES. The PDD is one level up: it is about how analysts work, not about books.
1.3 Two names
The earlier sources (2005, 2006) say "process-data diagram"; later work from the same group, such as a 2010 Utrecht technical report and a 2024 arXiv report, says "process-deliverable diagram" (Vlaanderen, van de Weerd & Brinkkemper 2010, UU-CS-2010-025; España & Ramautar 2024, arXiv:2205.15279). Both are abbreviated PDD and refer to the same notation.
2. Origins: method engineering
2.1 The problem PDDs were built for
PDDs came out of method engineering, a research field concerned with designing development methods themselves. The 2005 report quotes Kumar and Welke (1992) that "there is no detailed information systems methodology which is the best in all situations," and Brinkkemper's (1996) definition of method engineering as "the engineering discipline to design, construct and adapt methods, techniques and tools for the development of information systems" (van de Weerd 2005). Brinkkemper's paper "Method engineering: engineering of information systems development methods and tools" appeared in Information and Software Technology volume 38, issue 4, pages 275–280, in 1996 (Brinkkemper 1996, DOI01059-9); bibliographic record only).
The same report quotes Brinkkemper's definition of a method as "an approach to perform a systems development project, based on a specific way of thinking, consisting of directions and rules, structured in a systematic way in development activities with corresponding development products" (van de Weerd 2005). Note the pairing in that definition: activities with corresponding products. A PDD draws exactly that pairing.
2.2 Situational and assembly-based method engineering
Situational method engineering tunes a method to a particular project. The 2005 report quotes Harmsen, Brinkkemper and Oei (1994) defining a situational method as "an information systems development method tuned to the situation of the project at hand." It describes the "assembly-based" approach, attributed to Brinkkemper (1996) and to Ralyté, Deneckère and Rolland (2003): characterise the project, select method fragments from a method base, and assemble them (van de Weerd 2005). The 2010 report quotes Harmsen and colleagues' definition of a method fragment as "a description of an IS engineering method, or any coherent part thereof," and notes that "the method fragments consist of a process part and a product part, with the addition of a link between these two parts" (Vlaanderen et al. 2010). A PDD is a picture of a method fragment: process part, product part and link.
2.3 Saeki's proposal
The 2005 report credits the starting point: "Saeki (2003) proposed the use of this meta-modeling technique for the purpose of attaching semantic information to the artifacts and for measuring their quality using this information. In this research the modeling technique is adopted to reveal the relations between activities (the process) and artifacts" (van de Weerd 2005). The 2010 report likewise says the approach "is used based on the proposal of Saeki (2003)" (Vlaanderen et al. 2010). Saeki's 2003 paper itself was not read for this page.
2.4 Why a new technique
The 2005 report gives the reason the Utrecht group adapted a technique rather than using an existing one: "existing meta-modeling techniques appeared to be too complex to use. Therefore, an existing meta-modeling technique, resulting in a process-data diagram, is adopted and adjusted for the purpose of method engineering." It claims that modelling "the relations between activities and concepts" makes it "possible to engineer both process and data part of the method ... in a compact and elegant way" (van de Weerd 2005). That is the authors' own assessment.
3. Key publications and timeline
| Year | Publication | What it contributed |
|---|---|---|
| 2005 | Van de Weerd, WEM: A Design Method for CMS-based Web Implementations, Utrecht technical report UU-CS-2005-043 | Full description of the notation (Chapter 8) and its use to build a method for a Dutch web company (report) |
| 2006 | Van de Weerd, Brinkkemper, Souer & Versendaal, Software Process: Improvement and Practice 11(5), 521–538 | Peer-reviewed version; two case studies (DOI; abstract read) |
| 2007 | Souer, van de Weerd, Versendaal & Brinkkemper, Int. J. Web Engineering and Technology 3(4) | Web Engineering Method (WEM) for CMS-based web applications (DOI; abstract read) |
| 2009 | Van de Weerd & Brinkkemper, "Meta-Modeling for Situational Analysis and Design Methods," IGI Global handbook chapter, pp. 35–54 | The chapter most often cited for the notation (DOI; abstract read) |
| 2010 | Vlaanderen, van de Weerd & Brinkkemper, Utrecht technical report UU-CS-2010-025 | PDDs for software product management assessment; MetaEdit+ implementation (report) |
| 2022–2024 | España & Ramautar, openESEA modelling language, arXiv:2205.15279 | PDDs used to model environmental, social and governance accounting methods (arXiv) |
The 2006 paper's abstract summarises the approach as four steps, "(a) identification of implementation situations, (b) selection of candidate methods, (c) analysis and storage of relevant fragments in the method base, and (d) assembly of the new method using route maps to obtain situationality," supported by "a meta-modeling technique, resulting in a process-data diagram, which integrates UML (Unified Modeling Language) activity diagrams and class diagrams" (van de Weerd et al. 2006). The 2009 chapter's abstract says it presents "an assembly-based method engineering approach for constructing situational analysis and design methods," supported by "a meta-modeling technique, based on UML activity and class diagrams," with case studies on "method evolution" and "method construction" (van de Weerd & Brinkkemper 2009). (The 2010 report cites this work as "Weerd & Brinkkemper (2008)"; the publisher's record gives 2009. This page uses 2009.)
4. The notation, piece by piece
All descriptions in this section come from Chapter 8 of the 2005 report unless noted (van de Weerd 2005).
4.1 Left side: the meta-process model
Meta-process modelling "is done by adapting the UML activity diagram." It consists of activities and transitions (arrows); activities can be divided into sub-activities. The report defines four kinds of activity:
- Sequential activities must be carried out "in a pre-defined order" and are joined by arrows. Start and stop states are a special kind of sequential activity.
- Unordered activities are sub-activities that have no required sequence; they are drawn "as sub-activities without transitions within an activity." Only sub-activities can be unordered. The report's example is from the Unified Process: inside "describe candidate requirements," four sub-activities such as setting priority, status, risk and type can be done in any order.
- Concurrent activities happen in parallel, drawn with "forking and joining" on a synchronisation bar. The example: at the company studied, defining actors and defining use cases were done concurrently because the two "influence each other to a high extend."
- Conditional activities are carried out only if a condition holds, drawn with a diamond-shaped branch whose outgoing arrows carry guard expressions. The example: requirements analysis begins by studying the material; if
[requirements clear], the extensive elicitation session is skipped,[else]it is held.
4.2 Right side: the meta-data model
The right side "consists of a concept diagram. This is basically an adjusted class diagram." A concept is "a simple version of a UML class." Concept names are written in capitals, "not only in the diagram, but also when referring to them" in text. Three kinds of concept are used:
- Standard concept: "a concept that contains no further (sub) concepts," drawn as a rectangle.
- Open concept: a complex concept "whose (sub) concepts are expanded," drawn as "two white rectangles above each other."
- Closed concept: a complex concept "whose (sub) concepts are not expanded since it is not relevant in the specific context," drawn as "a white rectangle above a black rectangle."
The report's example from the Unified Process: the USE CASE MODEL is an open concept made of ACTORS and USE CASES; ACTOR is a standard concept; USE CASE is shown closed because its description, flow of events and conditions were not needed in that diagram.
Relationships between concepts follow UML class-diagram conventions:
- Generalisation: "a solid arrow with an open arrowhead, pointing to the parent."
- Association, with a name and reading direction (example: "SURVEY DESCRIPTION describes USE CASE MODEL").
- Multiplicity: (1), (0..1), (0..), (1..) or an exact number such as (5).
- Aggregation: a "has-a" relation between a whole and its parts.
- Properties: written "in lower case, under the concept name" (example: FEATURE with priority, type, risk and status).
4.3 The link
"The integration of both types of diagrams is quite straightforward. Each action or activity results in a concept. They are connected with a dotted arrow to the produced artifacts" (van de Weerd 2005). The 2010 report describes the same rule: the two models are integrated "by connecting every activity with its associated artifact through a dotted line" (Vlaanderen et al. 2010).
4.4 Activity and concept tables
PDDs are usually accompanied by tables that define each activity and each concept in words. The 2010 report says that for each of four focus areas "a PDD was drawn based on the findings at the case company. Also, activity and concept tables were created based on the PDD's" (Vlaanderen et al. 2010). The 2005 report gives prose descriptions of activities and concepts alongside its diagrams (for example, the orientation phase in its Section 13.4) (van de Weerd 2005).
4.5 A worked example
Hypothetical example (made up for this page, not from a source). Consider a small team's method for handling bug reports.
Left side (process):
- Receive report (sequential, first).
- Triage report, with unordered sub-activities Set severity, Set component, Check for duplicates.
- A branch:
[duplicate]→ Link to existing report → stop;[else]→ continue. - Concurrently: Write reproduction steps and Estimate effort, joined on a synchronisation bar.
- Schedule fix (sequential, last).
Right side (deliverables):
- BUG REPORT (open concept) with properties severity, component, status; it consists of 1 REPRODUCTION STEPS (standard concept) and 0..1 EFFORT ESTIMATE (standard concept).
- DUPLICATE LINK (standard concept), associated with exactly 1 BUG REPORT ("refers to").
- RELEASE PLAN (closed concept, because its internal structure belongs to another part of the method) contains 0..* BUG REPORTS.
Dotted links: Receive report → BUG REPORT; Write reproduction steps → REPRODUCTION STEPS; Estimate effort → EFFORT ESTIMATE; Link to existing report → DUPLICATE LINK; Schedule fix → RELEASE PLAN.
Even this small example shows the point of the notation: a reader can see at a glance which step creates which document, and which documents are only placeholders (closed) for detail kept elsewhere.
5. How PDDs have been used
5.1 Building a web implementation method (2005–2007)
The 2005 report was written for GX, a Dutch company whose product was the GX WebManager content management system. Van de Weerd analysed GX's own process, the Unified Process and UML-based Web Engineering (UWE), drew PDDs of each, stored their fragments in a method base, and assembled a new method, the GX WebEngineering Method (WEM). The PDD notation was "used in analyzing, storing, selecting and assembling the method fragments" (van de Weerd 2005). In the report's example of the orientation phase of a complex project, CONTROL MANAGEMENT is drawn closed because "project management is actually not within the scope of this research," while RISK MANAGEMENT is expanded because "in a complex project is RISK MANAGEMENT of great importance" (van de Weerd 2005), a direct illustration of what open and closed concepts are for.
Observed result (authors' case study). The 2005 report says the method "was validated in a case study, which consisted of a technology testing web application at a large telecommunication organization in the Netherlands. The case study results were promising" (van de Weerd 2005). The 2006 journal paper reports two case studies, "at a large health insurance organization and a telecommunication organization in the Netherlands," and says "the new implementation method performed well in both case studies, and the project workers were satisfied with the associated templates and instructions" (van de Weerd et al. 2006; abstract only). These are evaluations by the method's own developers. The 2007 paper by Souer and colleagues reports the method "successfully validated" at GX (Souer et al. 2007; abstract only).
5.2 Assessing software product management (2010)
Kevin Vlaanderen's 2010 master's thesis, supervised by van de Weerd and Brinkkemper and published as a Utrecht technical report, used PDDs to describe the software product management (SPM) processes of companies at four levels: portfolio, roadmap, requirements and release. It combined PDDs with a "capability matrix" so that a single model could capture both a company's process and its maturity. The report praises the notation: "The process-deliverable diagram ... is a strong instrument for the description and communication of software development processes. The two combined views, process and deliverable, provide an easy-to-use and clear view of all the main parts of a process" (Vlaanderen et al. 2010). It also mentions earlier use of PDDs for "the visual description of method increments by Weerd et al. (2007)," that is, describing how a method changes over time.
5.3 Environmental, social and governance accounting (2019–2024)
At Utrecht University and the Valencian Research Institute for Artificial Intelligence, Sergio España and Vijanti Ramautar built openESEA, an open-source tool for environmental, social and governance accounting (ESGA) methods such as the GRI Standards and the B Impact Assessment. To design its modelling language they write: "We model ESGA methods, using the Process Deliverable Diagram (PDD) notation [van de Weerd and Brinkkemper, 2009]. The models are created based on method documentation and official information published by the organisation that developed the method ... The PDDs are validated with experts." They then compare methods by "creating activity and concept comparisons," adapting a method-comparison approach from van de Weerd and colleagues (2007), and feed the result into a UML class-diagram metamodel (España & Ramautar 2024). This shows the notation in use well outside software development, and nearly two decades after it was introduced.
6. Tools
The sources mention two tools.
- Microsoft Visio. The 2010 report refers to "the original Process-Deliverable Diagrams in Visio" (Vlaanderen et al. 2010).
- MetaEdit+, a meta-modelling tool. The 2010 report built a PDD language in MetaEdit+ that "can be used to create PDDs in a more user-friendly and efficient manner" and "allows exporting to XML and latex." Implementing it required eight object types. It notes that the original drawings had "four types of activities ... standard activities, open activities, sub activities and closed activities," which "served only the purpose of visual distinction, and did not differ much in semantics," so the MetaEdit+ version reduced them to one object type whose appearance changes with context. It also defined connection rules such as "An activity may be in at most 1 from role" (Vlaanderen et al. 2010).
A small notation difference between the sources. The 2005 report classifies activities by ordering (sequential, unordered, concurrent, conditional) and concepts as standard, open or closed. The 2010 report describes the Visio-era activities as standard, open, sub and closed, a visual distinction applied to activity boxes. These are two different classifications, not a contradiction. The 2010 wording implies that activities, like concepts, could be drawn expanded (open) or collapsed (closed).
7. Comparison with related notations
Editorial comparison, based on the sources' descriptions:
- UML activity and class diagrams on their own. The PDD borrows both. The Unified Modeling Language is specified by the Object Management Group; version 2.5.1 was published in December 2017 (OMG UML 2.5.1). A PDD differs by putting the two side by side, using them at the meta level, adding open and closed concepts, and adding the dotted "produces" link.
- OMG SPEM. The Software & Systems Process Engineering Metamodel (SPEM 2.0, April 2008) is an OMG standard for describing development processes (OMG SPEM 2.0). It covers similar ground with a far larger metamodel. The 2005 report's remark that existing techniques were "too complex to use" was made before SPEM 2.0 and does not name SPEM specifically, so no direct comparison by the PDD's authors was found.
- Method chunks and other fragment formats. The 2010 report lists six modularisation constructs in situational method engineering: "'method fragments', 'method chunks', 'method components', 'method services', 'OPF fragments' and 'FIPA fragments'." Method chunks, from Ralyté and Rolland, describe processes with NATURE context trees or MAP graphs and add a "descriptor" of when a chunk applies (Vlaanderen et al. 2010). The PDD is the diagram form typically used for method fragments; it has no built-in field for the situation in which a fragment applies.
- Data flow diagrams and BPMN. The earlier draft compared PDDs with these. No source read here makes that comparison, so it is not repeated as a claim. Editorially, the main difference is level: a data flow diagram or a BPMN model usually describes one business process or system, whereas a PDD describes a method that people follow to produce deliverables.
8. Strengths and limits
8.1 Strengths claimed by the developers
- Compactness. "Compact and elegant," in the 2005 report's words (van de Weerd 2005).
- Communication. "Easy-to-use and clear," per the 2010 report (Vlaanderen et al. 2010).
- Familiar parts. Built from UML, so many analysts can read it quickly.
- Comparison. Because activities and concepts are named explicitly, two methods can be compared side by side, as openESEA does (España & Ramautar 2024).
These are the views of the notation's developers and users. No independent usability study of PDDs was found for this page.
8.2 Limits named in the sources
- Not machine-readable by default. The 2010 report says PDDs "were always oriented towards humans. However, they were not stored in a machine-readable, interchangeable and standardized way," which is why it moved them into MetaEdit+ (Vlaanderen et al. 2010).
- Added notation can clutter. When the 2010 report added a capability attribute to PDDs for maturity assessment, it noted "the notation is somewhat complicated by the display of the process attribute. Also, freedom is somewhat restricted by the added structure" (Vlaanderen et al. 2010).
- Mixed sequential and unordered steps. The 2005 report notes that when an activity mixes sequential and unordered sub-activities, "the solution to this modeling issue is to divide the main activity in different parts" (van de Weerd 2005). That works, but it shows the notation has no single symbol for "partly ordered."
8.3 Editorial cautions
Editorial suggestions, not from a source: a PDD shows what a method prescribes, not what people actually do; drawing one from documentation (as openESEA does) and then validating it with experts, as España and Ramautar describe, is a sensible safeguard. Large methods produce large diagrams; closed concepts and closed activities exist precisely to keep each diagram readable, and the GX example shows them being used that way.
9. Practical checklist for drawing a PDD
Editorial suggestions, distilled from the notation rules in Section 4:
- Decide the scope: one phase or workflow per diagram.
- List activities with verbs and decide for each group whether it is sequential, unordered, concurrent or conditional.
- List deliverables as nouns in capitals; mark each standard, open or closed.
- Add relationships: aggregation for "consists of," association with a name for anything else, multiplicities on both ends.
- Draw a dotted arrow from every activity to what it produces. An activity with no output, or a concept nothing produces, is a sign that something is missing.
- Write the activity table and concept table, defining each item in a sentence.
- Validate with someone who uses the method.
10. Frequently asked questions
Is a process-data diagram the same as a process-deliverable diagram? Yes. Both names refer to the same Utrecht notation; later sources prefer "process-deliverable" (Vlaanderen et al. 2010).
Who created it? Inge van de Weerd and Sjaak Brinkkemper at Utrecht University, with co-authors, adapting a technique proposed by Saeki in 2003 (van de Weerd 2005; van de Weerd & Brinkkemper 2009).
Is it a formal standard? No source describes it as one. UML and SPEM are OMG standards; the PDD is a research notation built from UML.
What is it for? Describing development methods so they can be analysed, compared, stored as fragments and assembled into new, situation-specific methods.
Can I draw one in an ordinary diagram tool? The original diagrams were drawn in Visio, and a MetaEdit+ implementation was built in 2010 (Vlaanderen et al. 2010). Any tool that can draw UML activity and class shapes can produce one by hand.
11. Bottom line
The process-data diagram is a small, well-defined notation with a clear academic origin: Utrecht University's method-engineering research in the mid-2000s. It joins an adapted UML activity diagram (what people do) to an adapted UML class diagram (what they produce) with dotted "produces" arrows, and adds open and closed concepts so detail can be shown or hidden. It was built to break existing methods into reusable fragments and assemble new ones, first for a Dutch CMS company, then for software product management, and more recently for environmental, social and governance accounting. Its developers praise it as compact and clear; its own later users noted that it was not machine-readable without extra tooling and can become cluttered when extended. It is not, on the evidence read here, a general business data-lineage tool, which is how the earlier draft presented it.
Sources
Last checked: 2026-11-27
- van de Weerd, I. (2005). WEM: A Design Method for CMS-based Web Implementations. Technical report UU-CS-2005-043, Department of Information and Computing Sciences, Utrecht University (full text read). https://ics-archive.science.uu.nl/research/techreps/repo/CS-2005/2005-043.pdf
- van de Weerd, I., Brinkkemper, S., Souer, J., & Versendaal, J. (2006). "A situational implementation method for web-based content management system-applications: method engineering and validation in practice." Software Process: Improvement and Practice 11(5), 521–538 (abstract read). https://doi.org/10.1002/spip.294
- Souer, J., van de Weerd, I., Versendaal, J., & Brinkkemper, S. (2007). "Situational requirements engineering for the development of Content Management System-based web applications." International Journal of Web Engineering and Technology 3(4), 420 (abstract read). https://doi.org/10.1504/ijwet.2007.014441
- van de Weerd, I., & Brinkkemper, S. (2009). "Meta-Modeling for Situational Analysis and Design Methods." In Handbook of Research on Modern Systems Analysis and Design Technologies and Applications, IGI Global, pp. 35–54 (abstract read). https://doi.org/10.4018/978-1-59904-887-1.ch003
- Vlaanderen, K., van de Weerd, I., & Brinkkemper, S. (2010). Improving Software Product Management Processes: a detailed view of the Product Software Knowledge Infrastructure. Technical report UU-CS-2010-025, Utrecht University (full text read). https://ics-archive.science.uu.nl/research/techreps/repo/CS-2010/2010-025.pdf
- España, S., & Ramautar, V. (2024). The openESEA Modelling Language for Specifying Environmental, Social and Governance Accounting Methods, version 4. arXiv:2205.15279 (v3, 18 Oct 2024; introduction and metamodel section read). https://arxiv.org/abs/2205.15279
- Brinkkemper, S. (1996). "Method engineering: engineering of information systems development methods and tools." Information and Software Technology 38(4), 275–280 (bibliographic record; quoted via van de Weerd 2005). https://doi.org/10.1016/0950-5849(95)01059-9
- Object Management Group. Unified Modeling Language, version 2.5.1 (December 2017), specification page. https://www.omg.org/spec/UML/2.5.1/About-UML
- Object Management Group. Software & Systems Process Engineering Metamodel, version 2.0 (April 2008), specification page. https://www.omg.org/spec/SPEM/2.0/About-SPEM
This page was researched and written by an AI assistant for Apiary from an unsourced local draft. Sources were opened and read on 27 November 2026. It has not been reviewed by a human expert. Status: candidate.