ApiaryActiveLive
Try: pause · settings · learn · wipe
← Community / Reading Room
TS
landscape-climate · 24 min read

The Same Rainfall Can Produce Two Very Different Flood Curves

!A small stream under a footbridge just after rain with a water gauge on the bank (generated illustration)

A small stream under a footbridge just after rain with a water gauge on the bank (generated illustration)
A small stream under a footbridge just after rain with a water gauge on the bank (generated illustration)
Six hours of hypothetical quick-response discharge (illustrative; data table below)
Six hours of hypothetical quick-response discharge (illustrative; data table below)
PointValue (m³/s)
0 h1
1 h2
2 h10
3 h7
4 h3
5 h1

Illustrative calculation, not observations from the linked source. Assumed teaching sequence, not data from USGS or an actual storm.

Two creeks can receive the same total rainfall on the same afternoon and send water past their gauges on very different schedules. One curve can rise abruptly and fall before the other has reached its highest point. The broad, lower curve need not represent less water. The narrow, taller curve need not come from more rain. To figure out what differs, you have to read both the height and the width of the discharge curve, then ask what the rainfall measurement actually represents.

Imagine comparing two unnamed tributaries of the same river. The gauges happen to start and finish the comparison window at the same discharge. At one, the highest sample is 10 cubic meters per second. At the other, it is seven. Looking only at those two numbers would suggest a larger event at the first outlet. But if we calculate the volume that passed each gauge, using explicit assumptions, the two totals can be identical. The exercise shows why a peak belongs in a report, but does not get to stand in for the rest of the report.

There are also two different kinds of height to keep straight. A discharge plot has a high point where the rate of flow is high. A stage plot has a high point where the water surface is high relative to a local reference. Those are physically related, but they are not interchangeable. A crested streamgage chart is not automatically a discharge chart, and a discharge chart is not an inundation map.

This article is about interpreting completed events, not forecasting floods or deciding whether a crossing is safe. The small hypothetical curves below are deliberately simple. Real streams make you contend with missing values, moving rain, uncertain estimates, operations upstream, and water that has been in the basin longer than the storm.

First establish what the graph measures

A hydrograph shows how a water-related quantity changes over time. The vertical axis might show water level, discharge, or another measured or derived quantity. Start by reading that axis and identifying the observation location. The difference between stage and discharge is not a technicality to sort out after comparing curves. It determines what arithmetic, if any, you should apply.

Stage is the height of the water surface relative to a reference at the gauge, generally called the gage datum. A reading of two meters does not usually mean the channel is two meters deep everywhere at that section. The reference may not be at the bottom. A person standing at the bank would also find a shape rather than a uniform depth across the channel. Two gauges reporting the same stage may have entirely different local channel geometry and reference elevations. Comparing their raw stage numbers like two water depths in the same tank would be a mistake.

Discharge, or streamflow, describes volume passing through a section per unit time. A discharge of seven cubic meters per second is a rate, not a report that the stream contains seven cubic meters. A sustained rate of seven for ten seconds would move seventy cubic meters through the section. The meaning travels with the time interval. Discharge is the quantity to integrate if the question is how much water passed an outlet during a specified window.

The distinction explains why a gauge can record water level regularly without directly sampling the velocity across the entire stream at every timestamp. Hydrologists can develop a site-specific relation between stage and discharge from direct flow measurements spanning different conditions, and use that relation to estimate discharge from a stage record. USGS describes the stage measurement, discharge measurement, and conversion as separate steps. The relation has to fit the site and can change. Sediment deposition, scour, vegetation, ice, and downstream conditions can complicate a simple conversion. Even a value shown to several significant digits is not automatically known to that precision.

Check whether a chart says provisional or approved, whether any values are estimated, and whether a high reading is beyond the better supported part of the rating. Record what the provider says rather than inventing an uncertainty range. If the source supplies recent instantaneous discharge readings and a second source supplies a daily mean, a peak from the first series is not contradicted just because the second is lower. The two series answer different questions.

A graph can also place rainfall above or alongside the stream curve. That design helps show timing, but the rainfall marks and stream line do not gain common units. A rain bar might represent millimeters accumulated during fifteen minutes, while the stream line uses cubic meters per second. Some charts make rain bars descend from the top to keep the graphic compact. The downward direction in that design is not negative rainfall.

Read the illustrative line one hour at a time

The chart for this article shows a quick-response discharge sequence. From hour zero through hour five the six values are 1, 2, 10, 7, 3, and 1 cubic meters per second. They are values at six timestamps; the elapsed time between the first and last is five hours. The figure title describes the six hourly marks, not six full one-hour intervals of integration. None of these values came from USGS or from an actual storm. The linked USGS discussion is a reference on how to read a hydrograph, not the source of these numbers.

Hour zero is our comparison origin. It does not necessarily mean midnight, the start of a rain gauge accumulation, or the instant the first drop entered the basin. The curve rises between hours zero and two. Hour two has the highest sample, and subsequent samples are lower. Because the teaching example draws straight lines between points, its plotted maximum is also 10. With a real gauge record at one-hour spacing, a higher or earlier peak could have occurred between samples. A good interpretation distinguishes a plotted or sampled maximum from a verified continuous crest.

Now introduce an unplotted second outlet for comparison. At the same six timestamps, give it values of 1, 3, 5, 7, 7, and 1 cubic meters per second. Suppose an imaginary pair of rainfall records shows the same total for both outlets' drainage areas. The example deliberately does not specify all details of the hypothetical rain, or claim those rainfall records uniquely explain either stream curve. The curves are input assumptions to a comparison, not predictions from a rainfall model.

The quick sequence reaches 10 at hour two. The broader alternative reaches seven at hour three and stays at seven at hour four. If we linearly interpolate, that second curve has a one-hour plateau, rather than a uniquely timed maximum. Calling it a precise crest at hour three would ignore the equal hour-four value. In a report based strictly on sampled data, the clearest statement is that both hours three and four recorded the maximum. The alternative is not lower at all times: at hour one it is higher than the quick curve, and it exceeds the quick curve at hour four.

The event volume comparison depends on how the samples are turned into intervals. Here we use trapezoids: for each pair of neighboring timestamps, average the two discharge readings and multiply by the duration in seconds. This is exactly the area under the line segments we drew. For the quick curve those five interval-average rates are 1.5, 6, 8.5, 5, and 2 cubic meters per second. For the broader curve they are 2, 4, 6, 7, and 4. Both sets sum to 23 when the intervals are all the same length. Multiply each sum by 3,600 seconds per interval and each total is 82,800 cubic meters for the five-hour window.

That calculation is not a license to treat any values with hourly labels as point samples. A provider might report one mean rate per hour. For that series, multiply each mean rate by its own interval length; don't first average it with the next interval mean. Rainfall depths in each hour are a third kind of series. If they represent interval accumulations, they are already totals for that interval. Sum the mutually exclusive amounts after checking for gaps. A table with all three types of timestamp can easily invite the wrong calculation if its metadata is missing.

A constant one cubic meter per second would account for 18,000 cubic meters over our five-hour window. Subtract that baseline and both toy curves have 64,800 cubic meters above it. We chose the baseline only to show what the subtraction does. A real stream's underlying contributions can change during an event, and a constant baseline is not automatically justified by two equal endpoints. The 82,800 figure includes every modeled contribution crossing the section; the 64,800 figure applies only to the counterfactual one-unit reference we chose.

Equal peaks can hide very different volumes, too

Reverse the exercise. Give one hypothetical series the values 1, 4, 8, 4, 1, and 1 on the same hourly grid. Give a second series values of 1, 4, 8, 8, 7, and 1. Both have an observed maximum of eight. If someone only sends an alert summary with the peak, the numbers look identical. But a longer period of high discharge in the second case increases the volume.

Using the same trapezoid rule, the first volume is 64,800 cubic meters and the second is 100,800 cubic meters. The second curve moves 36,000 more cubic meters within the chosen window despite sharing the peak. Those are hypothetical volumes, not flood impacts. We haven't specified the shape of the channel, the extent of the floodplain, or what lies next to the water. The arithmetic is only a way to see how duration and rate jointly determine volume.

The reverse example matters for ecology as well as hydraulics. If a researcher wants to explain why material moved downstream, a comparison of peaks may be a reasonable starting point but won't isolate exposure duration or the timing of the material supply. If a wetland observer wants to explain why two piezometer traces stay elevated for different lengths of time, outlet peak is not the same variable as water level in the wetland. Selecting metrics starts with the physical question, not with the largest number on the panel.

A plot that covers only the rising limb introduces another trap. It can make a slower event look small simply because most of its volume arrives after the figure ends. A long window has its own downside: it may include a second storm, a managed release, or a shift in underlying flow. Neither an all-purpose twenty-four-hour cutoff nor a visual guess at a return to normal is guaranteed to isolate the event. Show the chosen dates and times, explain why those bounds fit this comparison, and repeat the calculation under a plausible alternative if the result hinges on the cutoff.

A curve that rises sharply and then remains slightly elevated can also accumulate important volume in a tail that looks unremarkable against a tall vertical scale. If the report is about tail behavior, a second panel with the same units and an explicitly tighter vertical range can help. It should never stand in for the main comparison where peak magnitude matters. Keep the full-scale panel and say which question each view answers.

An inch of rain needs a denominator and a clock

The title says the same rainfall, but that condition is not adequately specified by handing someone two gauge totals. Ten millimeters at the municipal building might represent rain at that building very well. It does not prove that a tributary draining several square kilometers received ten millimeters across all of its land. A narrow storm can unload on a headwater area while barely touching a rain gauge near the outlet. In reverse, an impressive downpour outside the basin may contribute nothing by the routes under study. The watershed is defined for an outlet, not by the convenience of the nearest rain gauge.

For a comparison meant to say something about entire catchments, ask whether rainfall is estimated as a basin average, measured at several sites, or represented by one station. A spatial estimate can be better aligned with the question, but it can be uncertain in ways a point gauge is not. An interpolated network can miss a small, intense cell. A radar-derived precipitation estimate can have uncertainty from sampling height, terrain, the conversion to rainfall, or calibration. Record the source and its scale. A picture of a storm in a weather app is not necessarily the gridded estimate used in the calculation.

It is possible to compare single-station totals if the claim is modest: the selected stations recorded the same depth. It remains possible that the two basins received different inputs. The practical repair is to label the input precisely, and not to turn a limitation into an assertion about cause. If the two basin averages come with enough uncertainty to make them indistinguishable at the precision reported, say that instead of claiming the rain was exactly equal.

Equal depth also does not imply equal incoming volume if the basins differ in size. A millimeter distributed over one square kilometer corresponds to one thousand cubic meters. Ten millimeters over two square kilometers corresponds to twenty thousand cubic meters, whereas the same depth over five square kilometers corresponds to fifty thousand. That conversion describes precipitation input for a uniformly interpreted area average, not outlet yield. A surface supply is not a guarantee about how much water arrives at the gauge before the chosen ending time.

The clock creates a second denominator. A thirty-minute burst and a light rain spread over hours can leave the same depth in a collecting gauge. The burst may deliver water faster than surfaces or soils can take it in, while a gentler event may allow more time for infiltration and storage. Conversely, a long event on already wet ground may sustain runoff through a much larger portion of the landscape. These are conditional mechanisms, not thresholds that can be read off a total.

A useful event comparison keeps the underlying rainfall series. The total remains important, but the sequence can reveal whether the rain arrived in one pulse, several pulses, or something closer to a steady rate. The largest reported ten-minute depth and the largest hourly depth capture different time scales. Ensure that any claimed peak intensity names its averaging interval. If rain was recorded every fifteen minutes, don't improvise an observed five-minute intensity from the same data.

The direction of storm movement matters because raindrops fall on places with different travel times to the outlet. In a simple teaching scenario, a rain cell moves from remote headwaters toward the outlet. Water from the earlier remote rainfall and later nearby rainfall can arrive more nearly together than under a different storm path. But that result depends on the travel routes and the speed of the storm. In another layout, the same direction may not align anything. The USGS runoff overview lists rainfall distribution and storm movement beside intensity, duration, basin shape, and drainage patterns. Comparing one time series at the rain gauge to another at the stream gauge cannot show which part of the watershed supplied every segment of the rising limb.

Separate the rate of delivery from the volume supplied

One way to reason about the plot is to distinguish production of runoff from delivery to the outlet. The two are connected, but they do not have to change together. Two hypothetical surfaces could contribute the same event volume to their respective outlets even if one delivers nearly all of it by late afternoon and the other keeps delivering it well into the evening. Conversely, two basins with similar travel times can pass different volumes if a larger share of the precipitation is held back or diverted in one.

Think of a courtyard containing pavement, planting beds, and a shallow swale. Water running off the pavement might reach a planting bed where some of it infiltrates. Or the same pavement might slope toward a curb inlet that connects to a lined channel. The existence of pavement does not tell you which route is active. For an actual observation, the layout and connections help explain what a percentage on a land-cover map leaves out.

Even an area connected by a pipe is not necessarily important in the same way in every storm. Under some conditions an inlet may intercept much of the local runoff; under others less water may reach it or flow along a different path. Stored water can be released on a delay, adding to a later portion of a hydrograph. A map of the likely drainage network is useful because it gives you hypotheses to compare against the observed timing and notes, not because each arrow guarantees a flow during the event.

The opposite error is to equate all vegetation with delayed runoff. Soil texture, depth, compaction, slope, plant cover, surface crusts, moisture, and the path available to water interact. Grassy ground at a facility with disturbed soil is not the same as an undisturbed plant bed nearby. A flow path across wet ground can be well connected to a stream even if there is no pavement. An outlet curve cannot reliably classify these possibilities on its own.

Land cover also interacts with factors downstream. A pond may be able to shift the timing of part of the outflow when it has available storage. Its effect can change if it starts full, releases water according to a schedule, or receives another inflow pulse. An informal bottleneck can temporarily store water upstream and release it later as levels change. Those descriptions explain why volume and speed can diverge; they do not predict what any given pond or culvert will do in a storm.

Ordinary streamflow includes water moving through or out of subsurface storage as well as water supplied by fast surface pathways. A rapid increase at an outlet is not a direct tag identifying the origin or age of each parcel of water. A slow component is likewise not proof that the current storm supplied none of that flow. Specialists can use observations and modeling to examine water sources, but a one-variable line is insufficient to draw those conclusions. When the mechanism isn't measured, use language such as “consistent with a faster connection” rather than treating the graph as a fingerprint for one cause.

This distinction helps interpret why a location's visual character after rain may not track gauge discharge neatly. A puddled trail can occur on a narrow strip that contributes little to the total outlet flow. An inlet that looks almost dry when visited later may have conveyed water quickly and finished its work by the time someone walked by. An image has its own time and place; if you use it as evidence, give those coordinates in the ordinary sense of when and where, not a caption that stands for the whole watershed.

The starting condition belongs in the comparison

The basin has a history at hour zero. Two rain events with nearly identical timing can produce different responses in the same watershed after different weather. If a previous storm has left soils wet or filled shallow storage, there may be less room to store incoming water before pathways become active. In another case the period before a storm may have been dry, but some surfaces can take up little water over the first intense minutes. Antecedent wetness is informative, not a universal label that tells you what each surface does.

Pre-event streamflow is one piece of that history. It can be useful to record the discharge observed before the rise, and the direction it was already moving. A gauge that had been declining for several hours is not in the same initial situation as a gauge that had been rising even before the documented local rain. Neither observation is a substitute for a basin-wide measurement of soil moisture. If the comparison assumes no other plausible source for an existing rise, check what that assumption rests on.

For an archived event, use the information you actually have. Perhaps there are reliable daily rainfall totals for the previous week but no soil data. You can report the previous-week rain as context and identify the absence of soil observations. Don't call the soil saturated solely because recent rain is visible on a chart. If a water-management operator published a release record, record when the release changed rather than inferring a release from the hydrograph's shape. A similar-looking shoulder might have other causes.

When a preceding storm and a new storm overlap, the chosen baseline matters especially. Picking a constant line equal to discharge at the first plotted time may subtract too much or too little if the underlying component was changing. A defensible analysis reports the total flow crossing the gauge, then treats any estimate of event-related flow as model-dependent. If there are multiple defensible baselines, present how the excess changes. This is more informative than computing a single isolated runoff fraction to two decimal places.

A simple sensitivity exercise clarifies the point. If the teaching event's constant reference were 1.2 instead of 1 cubic meter per second, the raw volume would stay 82,800 cubic meters. The reference area would rise from 18,000 to 21,600 cubic meters. Simply subtracting that area would give 61,200 instead of 64,800 cubic meters, without truncating cases where the reference lies above the observed line. This is signed excess, not a physically separated storm component. One might instead clip negative differences or reject such a baseline; that would be a different operation which should be named if used. The arithmetic neither licenses that baseline for the toy event nor tells which method is correct for a real one.

The start state can also change what an equal rainfall total means for effects outside the outlet. A basin that temporarily stores one event's water can still have wetter ground afterward, which affects a second event. Conversely a shorter outlet pulse could coincide with less time for some off-channel areas to receive water. These possibilities illustrate why a gauge is evidence about conditions at a section, not a record of every effect in a landscape.

How to compare lag without moving the goalposts

Lag sounds like one property, but it requires two declared reference times. A reader could interpret “two hours of lag” as the time from the start of recorded rain to the first detected rise, the interval between the heaviest rainfall bin and the largest discharge sample, or the distance between a rainfall center of mass and a chosen feature on the stream curve. These intervals are not interchangeable. Start with a name that describes the calculation. “Time from largest 15-minute rain accumulation to maximum sampled discharge,” though less elegant, tells someone what to reproduce.

Suppose the heaviest accumulation was assigned to the bin ending at 15:15 and the stream's observed maximum was at 16:00. Subtracting the labels produces 45 minutes, but the rain fell during the previous 15-minute interval, not necessarily at its end. The gauges might not share the same sampling interval and the actual flow peak could have fallen between discharge samples. If the data justify only a coarse timing comparison, saying “roughly an hour” or describing the bins is more defensible than claiming an exact 45-minute physical travel time.

A rain record with two similarly large pulses complicates a peak-to-peak comparison. Subtracting the time of one largest bin from the time of the one largest discharge reading may pair features that aren't directly connected. Sometimes the useful result is the first measurable response and two subsequent peaks, not a single lag number. Highlight the full curves and note if the choice between the rain peaks changes the interpretation. If the archive has a gap where the highest value could have occurred, there is no substitute for marking that interval unknown.

Timing labels can carry subtle inconsistencies even if the graph's horizontal axis appears to align. One feed may use a local clock and another UTC. A rain accumulation may be identified by its beginning, while the stream instrument value is instantaneous. When a comparison spans a daylight saving change, a repeated wall-clock hour needs a time zone and offset to remain distinct. Preserve original timestamps for audit, convert both streams to a declared common basis for analysis, and only then zoom into a window. Aligning plots by eye is not a reliable substitute for those steps.

One legitimate reason to set both plots to hour zero is to compare shapes relative to a well-defined event marker, such as the start of an independently identified rainfall pulse. But such alignment cannot simultaneously demonstrate that the two peaks occurred at the same absolute time. An event-relative display and a common-clock display make different claims. A practical report may use each view, label them clearly, and retain a way to map elapsed time back to the original timestamps.

Don't equate lag between two measured peaks with the transit time of a parcel falling as rain. A watershed can respond to new input by changing flow through water and storage already in the system. It can also have a mixture of travel paths rather than one representative distance. The lag calculation describes two features of two time series, and its interpretation depends on what else is known. If the title of a figure turns the lag into a transit time, the title has quietly made a stronger claim than the calculation.

What a real example does and does not demonstrate

USGS shows rainfall and streamflow for Peachtree Creek at Atlanta, Georgia, station 02336300, on December 24, 2002. The figure lets a reader inspect rainfall in 15-minute increments alongside streamflow over the day. The case makes the scale of a storm rise legible relative to pre-event flow and shows why a series of rates can also be used to estimate volume over a day. It is not the source of either curve in our arithmetic exercise. It also does not contain a control watershed with identical rainfall.

To use the example responsibly, distinguish a documented event at that gauge from the general mechanism it helps teach. It establishes that one observed stream went through a major increase during a particular rain episode. It does not tell you that an inlet, a roof, or one land-cover category caused a specified fraction of the increase. And it cannot establish that the same rainfall would reproduce the displayed curve next year. Those would require evidence beyond the graphic.

If you want to create a fair comparison from public records, choose the outlets and event screening rules before reading the final plots. Two nearby gauges that happen to have very different-looking hydrographs may make a vivid illustration, but they do not constitute evidence about what happens typically. Starting with an inventory of candidate storms exposes missing records, cases with ambiguous rain matches, and events where neither gauge shows a notable rise. Reporting those exclusions makes readers less likely to mistake a memorable pair for the full population of events.

Similarly, if the question is whether changing development changed a catchment's response, one old event and one new event cannot separate the effect of timing, wetness, watershed size, measurement changes, and other alterations. Even a careful matched pair can support a limited comparison, not unanimous attribution. A more informative research design could include a series spanning comparable rainfall conditions and a comparison outlet, while checking consistency in the supplied gauge methods. This article's purpose is to identify the missing terms, not to promise a design that answers every watershed question.

A historic graph is not an operations screen. Do not use these examples, a manually extrapolated rating, or an old peak to make an immediate safety judgment. For active flood conditions consult official notices and emergency guidance instead of drawing a continuation of an archived line.

Build a comparison someone else can reproduce

A useful deliverable has a short narrative, a source and assumptions note, and enough data to recreate the reported metrics. Start with the gauges: give their identifiers, measured variables, units, station settings, and relevant dates. When using a temporary logger, disclose when it was installed, its known sampling interval, and any gaps or adjustments. Keep rainfall metadata with the rainfall series. Readers otherwise have no way to tell a gauge near the outlet from a basin-average product.

Show absolute discharge if the question is what passed each particular outlet. Where the question concerns response across areas, consider presenting a separately labeled area-normalized version. Dividing an event volume by its basin area converts the number to an equivalent depth; dividing a rate by area provides a different, rate-based comparison. Normalization does not repair an uncertain basin boundary or make two completely different settings controlled experiments. It simply puts the output on a denominator relevant to the question.

For each panel, label where the event window starts and ends, and note why you chose those bounds. A table can supply the largest sampled discharge, the times at which it occurs, the period total flow volume and the method used to estimate it. Include the rain total and rainfall interval definition in a distinct column rather than sharing a visual unit with streamflow. A derived excess volume deserves a separate name and an accompanying baseline definition. If stage is also reported, label the datum or reference with the information available from the provider, and avoid combining it numerically with discharge.

Mark missing data rather than silently connecting the last value before a gap to the first one after it. In a five-hour teaching example the straight edges are a declared model. In an event archive a straight edge through hours of missing streamflow could conceal the peak. Where the gap is short enough that interpolation is defensible for a stated purpose, disclose what was filled and why. Where it cannot be justified, report the volume for observed subwindows or withhold a comparison that would look falsely complete. A blank can be important evidence about the record even though it isn't an observation of the river.

Use visual scales that support the comparison you claim. If both gauges use the same variables and units, a common vertical scale makes peak differences visible without changing the proportions of one curve. If the smaller curve would otherwise be illegible, preserve a shared-scale panel and add a labeled magnified view. For an accessible alternative, provide the values and the main comparison in text and a table, along with the window, units and assumptions. A line color alone should not be needed to match the second outlet to its legend.

Finally, write the conclusion at the level supported by the data. For the constructed equal-volume pair it might read: “With five one-hour intervals and linear interpolation between the displayed samples, the curves both total 82,800 cubic meters. The quicker curve peaks at 10 cubic meters per second at hour two; the broader curve peaks at seven at hours three and four.” That is stronger than saying they seem similar and narrower than saying the two basins behave alike. It is also easy for someone else to check.

Sources

Frequently asked
What is The Same Rainfall Can Produce Two Very Different Flood Curves about?
!A small stream under a footbridge just after rain with a water gauge on the bank (generated illustration)
What should you know about first establish what the graph measures?
A hydrograph shows how a water-related quantity changes over time. The vertical axis might show water level, discharge, or another measured or derived quantity. Start by reading that axis and identifying the observation location. The difference between stage and discharge is not a technicality to sort out after…
What should you know about read the illustrative line one hour at a time?
The chart for this article shows a quick-response discharge sequence. From hour zero through hour five the six values are 1, 2, 10, 7, 3, and 1 cubic meters per second. They are values at six timestamps; the elapsed time between the first and last is five hours. The figure title describes the six hourly marks, not…
What should you know about equal peaks can hide very different volumes, too?
Reverse the exercise. Give one hypothetical series the values 1, 4, 8, 4, 1, and 1 on the same hourly grid. Give a second series values of 1, 4, 8, 8, 7, and 1. Both have an observed maximum of eight. If someone only sends an alert summary with the peak, the numbers look identical. But a longer period of high…
What should you know about an inch of rain needs a denominator and a clock?
The title says the same rainfall, but that condition is not adequately specified by handing someone two gauge totals. Ten millimeters at the municipal building might represent rain at that building very well. It does not prove that a tributary draining several square kilometers received ten millimeters across all of…
References & sources
  1. Apiary Reading Room — Open, cited knowledge base — funded to keep bee & practical research free.
From the Apiary Reading Room. Opinion & editorial — not financial advice. We don't overclaim.
More from the Reading Room