ApiaryActiveLive
Try: pause · settings · learn · wipe
← Community / Reading Room
OB
applied-measurement · 25 min read

One Bank Is Not a Whole River Reach

!Two differently colored survey tapes along an aerial river bend (generated illustration)

Two differently colored survey tapes along an aerial river bend (generated illustration)
Two differently colored survey tapes along an aerial river bend (generated illustration)
One Bank Is Not a Whole River Reach: worked example (illustrative; data table below)
One Bank Is Not a Whole River Reach: worked example (illustrative; data table below)
CategoryValue (bank meters)
Left300
Right200
Both500

Illustrative calculation, not sourced observations. Toy, sum non-overlapping bank lengths, not river centerline.

A field note says the crew walked five hundred meters of river. One person reads that as a five-hundred-meter stretch of channel. Another remembers walking on two separate sides and expects the distance to be the sum of their observations. A third assumes that both banks of the entire stretch were inspected. All three interpretations are plausible in ordinary conversation. In a field database they are different spatial claims, and at most one might match the note. The problem is not that anybody forgot the arithmetic. It is that nobody named the object whose length was being counted.

The situation is common because people work from paths, bridges, boats, map lines and sketches, while the river is a changing physical place with a width and two sides. Access to one side does not grant visibility or access to the other. Even a careful route on both sides may leave gaps where the terrain or permissions change. An inventory can document that work well without pretending that a route was continuous or that the observer saw every habitat between the chosen endpoints.

This guide shows how to record the side, segment, kind of observation and denominator, using an illustrative five-hundred-bank-meter total. It addresses record design and map interpretation, not field safety or permission to approach a river. Use the appropriate local procedures and access permissions for actual work. A coverage map is never a reason to enter dangerous water or cross a barrier to satisfy a target.

Use a river-relative side convention

The terms left and right change meaning depending on where a person stands or faces. For this article, assign left and right while facing downstream. A person looking upstream would have each river-relative bank on the opposite side of their body. A crew walking downstream might see the river beside them rather than be visibly facing along its center; the convention still refers to the river's direction, not the current pose of the observer. Record it in the data dictionary and remind people in the actual field form. “Left on the map” is not equivalent when the map can rotate.

The EPA National Rivers and Streams Assessment field manual provides an example of using the downstream-facing convention and deliberately organized observations along a defined reach. This article does not adopt that assessment's sampling requirements or promise that they fit a local inventory. Its relevant lesson is that side and spatial support are defined as procedure, not recovered by assuming what a person meant after their notes have lost context.

An unambiguous map can include a downstream arrow or numbered station direction. At a bend, the geographically northern bank of one segment may not remain north in the next. Storing east or west as a local free-text clue can be helpful, but it should not replace the reach's side convention. A georeferenced photo or sketch may help verify an ambiguous note. If a reviewer genuinely cannot establish which side was meant, use an unknown side field or hold the row from side-specific calculations. An unknown is more useful than a confidently wrong assignment.

Braided channels, islands and confluences make a single side label insufficient. Define the channel feature to which the side belongs. The left bank of a side channel can be physically on an island rather than at the left outer boundary of the main corridor. At a confluence, the next bank segment may be side-specific to another branch. Give channels and sections separate identifiers before assigning observations. If your objective concerns outer banks only, state what the design excludes. One familiar river name is not enough to orient a field note about several connected channels.

Tidally influenced or artificially regulated reaches raise another practical issue. A particular visit might observe water moving opposite the ordinary network direction. That does not require redefining which bank is left for every observation. Use the declared reference convention for the inventory and separately record observed flow direction under the conditions of the visit if relevant. Where no stable or intended direction can be defined, choose an explicit alternative such as named shoreline sectors. The key is reproducible identification, not using the same two words in every setting.

Set endpoints and say which line carries the length

A reach is a defined portion of the river for the purpose of the study. Identify its endpoints with enough detail that another observer can locate them. These can be known station marks, suitable mapped coordinates with described precision, named features supported by a map, or a combination. If endpoints were chosen from an established network dataset, record the edition and what part you used. If they were defined in the field, record how that relates to the map and identify unresolved discrepancies.

There are several useful lines in a reach. A centerline can support network distance and stationing. Left and right bank lines can support separate lengths following their geometry. A survey route records where a person or instrument moved. A near-bank path can lead away from the water around a fence or meander behind vegetation. It can be valuable as a record of access without being a defensible length of bank actually observed. The same distance units do not make these lines interchangeable.

The USGS National Map Viewer provides a way to explore geographic layers such as surface water and elevation. The EPA WATERS GeoViewer supplies a separate public view of water-related datasets and context. Both can be useful orientation sources, but neither automatically records the observer's actual bank coverage. Verify the data behind the view and whether its line represents a centerline, shoreline or other feature. Where the map is a starting reference, identify field observations separately instead of treating the map's completeness as proof that someone visited both sides.

If the goal is coverage along the bank, define what counts as its geometry. Is the relevant line a mapped bank, the edge of water at a particular stage, or a fixed field alignment independent of recent water level? On a shallow sloping surface the water edge moves with level even if a higher bank feature does not. Different definitions can all be useful. Measurements need a common basis if their lengths will be used together or across dates. Do not subtract two values from incompatible shoreline definitions and call the difference observed habitat change.

Measurement scale and coordinate handling matter too. A simplified line tends to omit small bends measured by a more detailed line. A distance in geographic angular coordinates cannot simply be called meters, and the area or length tools of an interface need to be used with the appropriate method for the dataset and region. Write down the selected geometry edition, length method and units. An inventory does not need maximum possible detail everywhere, but a comparison should not change its scale whenever that favors more coverage.

Reproduce the chart with 300, 200 and 500 bank meters

The chart uses a fictional inventory, not field observations from USGS, EPA or any real river. After accounting for repeated or overlapping observations within each side, the left bank contributes 300 meters of unique inspected bank length. The right bank contributes 200 meters by the same definition. Because the designated left and right lines describe disjoint bank segments for this example, the total across the two distinct bank lines is 500 bank meters. The calculation does not use the river centerline.

Illustrative coverageUnique inspected length
Left300 bank meters
Right200 bank meters
Both500 bank meters

The label Both refers to an additive total across bank lines, not a claim that both banks were inspected throughout a five-hundred-meter-long central channel. It also does not mean that the left and right inspected areas lay opposite one another. Their longitudinal spans are not specified in the chart. The correct textual alternative is that the fictional left inspected length is 300 bank meters, the right is 200, and they add to 500 across the two disjoint sides.

For a simpler mental test, assume both bank lines in a hypothetical straight reach are exactly 400 meters long and each has unambiguous bank endpoints. The full target is then 800 bank meters for a survey requiring both banks. Inspected unique lengths of 300 and 200 would give 500 out of 800, or 62.5 percent of the two-bank target in that specially stated example. The same observed numbers may stand without that denominator, and the article's chart does not assume it. Do not append 62.5 percent to a real chart when total target lengths and scope were never specified.

It is possible to ask a separate question: at how much of the reach did we see both sides at the corresponding downstream station? On a common stationing line, that requires finding the intersection of station intervals represented by both sides. If the left observations span stations zero to three hundred and the right observations span stations one hundred to three hundred under compatible assumptions, the supported common span is two hundred station meters in that specific schematic. A right span lying further downstream could have little or no intersection while giving the same 200 bank meters. This added example does not change the original chart; it explains why a two-bank length sum cannot answer an intersection question.

Finally check that the bar total is not added back to the two components during tabulation. Five hundred already includes both three hundred and two hundred. A chart that shows components and a total can be perfectly honest while inviting an incautious spreadsheet to aggregate all rows as though they were independent. Mark row roles or present the total separately when exporting machine-readable data. Readers who see only the table should still be able to tell how the total relates to its parts.

Choose the denominator before calculating coverage

“Coverage” can mean a proportion of intended bank length, a proportion of longitudinal stationing, a share of previously inventoried segments visited, or a fraction of designated observation points. Name the exact unit and intended universe before looking at the result. If the plan is to check both sides throughout a designated reach, the intended bank lengths may have to be summed independently. If the plan is to visit representative stations, count eligible stations under the sampling design. A rate expressed as percent is not automatically comparable to another rate if their denominators answer different questions.

A planned denominator should not silently become the accessible denominator. Suppose a permission issue kept a crew off part of one bank. Reporting “100 percent of accessible segments inspected” can be appropriate if access was indeed the defined eligible universe and the restriction is shown. Calling the result “100 percent reach coverage” would imply the omitted bank had been included. A robust report may provide both a fraction of the full planned target and a description of what proportion of the access-eligible target was inspected, with the respective denominators clearly visible.

One more trap is treating counts of notes as a measure of length. A densely documented problem area might generate ten records in twenty meters, whereas a uniform stretch could be described in one row covering a much longer line if the protocol supports that. Ten notes do not establish ten separate stretches or ten times the surveyed distance. Link entries to spatial support, and reserve counts of observations for questions about effort, encounters or survey design where appropriate. An observer log can serve several analyses without requiring that they all use the same denominator.

Sometimes the correct result is an absolute total with no fraction. If the available records genuinely establish unique inspected lengths but the full target shoreline was not defined or is not available at compatible scale, report the shortfall in evidence. A bank-length numerator can be useful by itself for understanding effort or describing which notes cover a mapped area. Giving a plausible but undocumented denominator would make a precise-looking claim that cannot be reproduced.

This distinction matters when the metric is reused for funding or reporting. A person may want to reward teams for covering both left and right sides rather than maximize easiest visible length. Another may care about the number of sections with paired observations, not total route effort. Choose a measure that reflects the actual work to be tracked and make it transparent. Changing the target because one team happened to have better access should not be confused with changing the count of observations supported by the existing records.

Keep the observation distinct from an observer's route

A volunteer walking an upland path sometimes sees a great deal of shoreline, then loses sight of the water behind a bend. A positioning trace documents the path of the volunteer, not the unseen portion of the bank. A second volunteer may stand in one safe permitted spot and observe part of the more distant bank clearly. Their track is almost zero length, but the observed bank segment can be defined if the method supports a stated view and scope. Neither person's route alone tells you where observations were made. Mark the intended support of the observation separately.

If observation varies by task, give it task-specific identifiers or qualification. An inspection of conspicuous large debris from a distance is not the same as a close assessment of bank texture or a fixed-area plant survey. Lengths might coincide on a map while the completeness and meaning of the checks differ. State what criteria earned an interval the descriptor inspected, and use partial or unassessed categories as appropriate. Where no useful length estimate can be supported, record a point observation with its limited support rather than stretching it between named landmarks.

Photos can help clarify position, but a photo taken from one bank may depict the other. A location marker for where the photographer stood is not necessarily a marker for where the subject was. Record the vantage and observed side where possible, along with the approximate segment or landmark the image shows. If a viewpoint includes only one corner of a larger reach, do not make the image evidence that every meter in view was examined with equal precision. Good notes make the link between visual record and observation scope without overstating either.

Visibility conditions deserve a role in the ledger. A submerged or vegetation-screened stretch may not support the same interpretation as an open stretch. A record can indicate where a planned method could not be completed and why. Distinguish lack of evidence from absence of the feature being sought. Blank data may represent a planned segment not safely approached, an unreadable observation or genuinely unperformed work. “No erosion observed” should not conveniently replace all three if the study is meant to compare observed bank conditions.

When a survey works with sensitive sites or privacy restrictions, do not treat map precision as an overriding goal. The internal record can identify support in a suitably controlled system; the public output can use safe generalizations with a note about their effect. Publishing the exact observer path is often unnecessary to explain an aggregate estimate. Reproducibility means authorized reviewers can understand how the number was obtained, not that anyone must be able to trace a person or restricted location from the public interface.

Remove overlap within each side without erasing repeat visits

Suppose the left bank has two observed intervals in a compatible distance coordinate: zero to two hundred and one hundred fifty to three hundred. Adding lengths would give three hundred fifty meters. Their union is zero to three hundred, so the unique covered length is three hundred. The overlapping fifty meters are valuable as repeat coverage, but are not additional unique space. If inspections sought temporal changes, those repeated observations deserve to remain visible. Compute the union as a derived quantity rather than deleting duplicate-space records from the archive.

The same logic can apply across multiple crews and days. A stable segment identity or documented stationing reference lets records refer to the same support without recreating each interval by hand. Where two geometries describe related but not identical bank lines, do not blindly merge them because their coordinates seem close. They might refer to distinct dates, shoreline definitions or sides. First establish that the segments can be interpreted on a common intended line. Only then use interval or geometric operations appropriate to the comparison.

Do not subtract opposite sides merely because they overlap in their longitudinal stationing. The left bank and right bank remain different spatial targets in the additive bank-meter measure, even if observations on both were made at exactly the same station interval. Conversely, do not add time-separated visits when the question concerns unique extent over a fixed campaign. The union belongs within a side and defined time window for coverage. The intersection belongs to the separate first question about where two sides were inspected over corresponding longitudinal positions.

Endpoint accuracy can make joins deceptively tidy. If each observer records landmarks to within an approximate range, two entries that meet exactly when rounded may leave a genuine small gap or overlap. Keep sensible precision and describe how the analysis treats borderline intervals. A measured gap can be counted if the evidence supports it; a possible gap might warrant an uncertainty note or bounded estimate. Do not add interpretive certainty by snapping all ends to the neatest numbers solely to make a map look complete.

A reproducible data pipeline can preserve both gross and unique effort. One table can report observed segment lengths per visit for operations. A derived union per side can report coverage of the defined target. A separate table can flag segments visited more than once. None of these totals is the universal answer to “How far did we survey?” A reader who understands those roles can choose among them without mistaking careful repeated inspection for an inflation error or, conversely, presenting the same meters several times as geographical expansion.

Work a plausible inventory where the two useful answers differ

A fictional team plans to document two banks between a bridge and the next safe mapped endpoint. A paved path parallels most of the left bank, but a short detour leaves the water out of sight. A second team views a defined segment on the right from permitted positions and records no observation farther downstream. The left-side route is long enough to reach both landmarks. Its start and end nonetheless do not establish continuous visible support. The right-side route is short but can still support an explicitly bounded observation on a section it actually saw.

In the report, the route log answers where the observers went and helps explain access constraints. The bank inventory answers which intervals were inspected using the declared procedure. A longitudinal station map can show whether left and right observations correspond at common stations. Rather than deciding which of these is the proper map and discarding the others, give them appropriate labels. The documentation becomes useful to a future planner who wants to identify remaining gaps, not just to a manager who wants one impressive total.

Suppose the two planned banks are different lengths because of a broad meander. The outside bank's distance can be greater than the inside bank's even though both run between equivalent cross sections. An observer who covered one hundred bank meters on each side has not necessarily traveled through the same station span on the centerline. If you need station correspondence, define it relative to a common reference and document the matching convention. The correspondence might be unavailable in parts of an unusually complex bank geometry. The absence of a robust match is a legitimate result.

Now ask the team for a summary of an inaccessible section. If it was scheduled, note its chance of exclusion under the project design and how it affects the reported denominator. Do not present lack of access as evidence the segment was in good condition. If periodic return visits could close the gap safely and appropriately, identify the target rather than treating the inaccessible record as a failed observer. A coverage ledger is valuable because it makes limitations visible in a way that gives future teams a concrete next decision.

Prepare a reach record that distinguishes spatial and temporal editions

A well-designed row can include reach ID, bank side and side convention, segment start and end on the chosen reference, observation date, measured or estimated length, surface definition or geometry edition, method, and status. Link to route information separately rather than using the route geometry as an automatic replacement. Add the feature or subject of the observation if coverage requirements differ across tasks. State the precision or mapping method where relevant. The row should travel sensibly even if copied from a map into a spreadsheet.

Make the reach and geometry version visible on summaries. A storm could alter shoreline or split a formerly simple segment. Maintenance could change a break in the route. An official dataset could revise its mapped line without any physical change to the river. If a year-to-year comparison uses different geometries, decide whether to compare against one stable reference or explicitly report separate support. Do not interpret every jump in bank meters as more work, physical widening or a longer route unless the evidence supports it.

Store the reason for missing, ambiguous, or partial segments if known. An analyst may need to distinguish unobserved space from visits that happened but failed a method-dependent quality check. Do not overwrite the raw record when a segment is reclassified. Retain a versioned rule or edit history so observers can understand why their note was used for a different part of the map. A good review process can correct a bank reversal without deleting the only original evidence that made the error detectable.

Review absent observations as carefully as completed ones

A useful field sheet distinguishes at least three cases that often become the same blank. One is a segment not included in the design at all. A second is a target segment that could not be safely or appropriately observed. A third is a completed observation with no recorded instance of the feature sought. If the last case was a valid observation, a zero count may be appropriate for that feature and task. It is not interchangeable with the first two cases. Whether a blank belongs in a coverage denominator or an outcome summary depends on what it means.

In a spatial file, the temptation is to hide inaccessible segments from the final map because they add no completed observations. That may be reasonable for a simple depiction of visited features but not for an assessment of coverage. Preserve the original target extent in the report or companion notes, including the denominator from which the published percent was calculated. An unvisited section can be symbolized separately or described in text. If publicly mapping it causes privacy concerns, provide an aggregate count and a brief explanation rather than showing details the audience does not need.

Be alert to changes that make unvisited sections systematically different. Safe accessible paths may favor one bank or sections that have already been modified. Where one side is mainly visible only at certain times, a single field day might not capture what the wider project is trying to learn. Do not generalize the absence of a condition from the visited subset to the whole reach without appropriate sampling support. A description of what was visible and what was not is valuable even when an inference beyond that cannot be made.

Sometimes the distinction is between missing measurements and restricted publication. The crew may have a valid record from a sensitive site but be unable to show its precise location. The coverage estimate can remain valid under the study's authorized processing while the public map uses different geometry or aggregate descriptions. Write down what can be inspected where. Removing precision from a public copy is not an instruction to delete evidentiary information or to fabricate a different observation in its place. State how generalization affects interpretation and which checks were made against internal records.

Use tests that separate counting, correspondence and observation quality

For the teaching fixture, enter two overlapping left intervals from zero to two hundred and one hundred fifty to three hundred on the same bank line. After merging overlap their unique sum must be three hundred. On an independent right-bank coordinate enter one two-hundred-meter interval. Sum the side-specific results to produce five hundred bank meters. A naive pipeline that treats every entry as distinct would obtain five hundred fifty. A different naive pipeline that merges opposite sides in one arbitrary coordinate might obtain less. The correct method keeps sides separate while merging duplicates within each side as required.

Add another toy case with two non-overlapping visits to one side. A map renderer might draw a line from the first start to the last end, making the gap disappear on screen. The report should preserve the gap in the geometry and in the total. A field spreadsheet can encode breaks as separate intervals and a separate target record. A field note saying the crew walked past the unobservable gap should still not count it automatically. This test catches the conflation of reach extents, route extents and observations.

Now test a correspondence claim independently. Set up a simple straight reference line and label segments by their projected station endpoints. Check whether the overlap of left and right station intervals answers the posed question about paired coverage. Include a right observation that lies fully downstream of its left counterpart to show that long individual segments can have zero common longitudinal support. These correspondence results require an agreed mapping from bank intervals to stationing in the example, not an assumption that bank distance equals centerline distance in any complicated geometry.

Finally test observation quality directly. A ledger can distinguish that a segment was visited and documented but the measurement needed for one task could not be completed because of limited visibility. Produce results for visit extent and method-specific assessed extent as separately labeled totals. You do not need to equate a declined or partial result with a bad volunteer. Respect for safety and valid conditions may be exactly what a good observer demonstrates. The coverage report is useful when it makes the work legible without incentivizing observers to stretch claims beyond the recorded evidence.

A reviewer should be able to re-create each measure from a small evidence packet: the chosen geometry conventions, bank assignments, inclusion and exclusion rules, and individual observation records or authorized summaries. Where the reviewer cannot reconstruct a match because a map line version is missing, identify the failing input rather than tuning the final result until it matches a previous chart. An apparently acceptable expected number can be reached by several wrong methods. The tests should verify intermediate relationships as well as the total.

Publish a caption that answers the predictable follow-up

A reader seeing a bar marked Both will reasonably ask what was combined. Answer beside the figure: the two side-specific unique lengths were added and the resulting quantity is bank meters, not along-channel meters or a statement of paired observation on both sides. Repeat the fictional status where the chart might travel without the longer story. The table gives that same result in text. If measured values someday replace the toy ones, update the method, dates, provenance and labels rather than allowing the illustration's assumptions to accompany the data unnoticed.

For a real report, identify the reach and endpoints, the task that qualified as inspected, and the time window for deduplicating visits. Put actual denominators where any percent is stated, and separate missed or uncertain segments from confirmed visits. A regional reference map should have a visible legend distinguishing its hydrography lines from the study's observed portions. Use readable labels or line patterns rather than color alone. A person who cannot distinguish the map colors should still be able to learn which side and segment are implicated.

Where the paper is read with no interactive map, a short text summary can retain surprising amounts of value. “We inspected portions of both banks, with separate observed lengths of three hundred and two hundred bank meters, from different locations within the reference reach” is more useful than “coverage: five hundred meters.” Add whether the locations overlapped in stationing if that conclusion was supported and matters to the decision. If it was not studied, do not imply it indirectly through the plural word both.

The most durable record holds three separate entities: the river reach with its defined geometry, the bank segments that were available or intended as targets, and the portions actually assessed under a stated method. Once those entities are named, the work does not lose meaning when a GPS trace gets simplified or a generic map layer is updated. Five hundred bank meters can then be exactly what it says without becoming a silent claim about every surface in the river corridor.

Plan the next visit from the gap map, not the headline number

A repeat campaign may start with the previous map showing three hundred bank meters to one side and two hundred to the other. If its purpose is to add unique coverage, the best target is not necessarily whichever bank has the smaller total. Look at which planned segments remain unassessed and how many can be examined with suitable authorized conditions. A small gap in a sequence of paired stations can matter more to one study than a long standalone extension. For a different study, the unvisited outer reach may be the priority. The headline number alone cannot identify the most useful location.

A mapper can prepare a separate work view with confirmed inspected intervals, scheduled revisit intervals, and unassessed areas whose status is still unresolved. Do not turn the proposed route into an observed line simply because it has been drawn. After the visit, reconcile the plan and the observations. If part of an intended interval was skipped or viewing conditions changed, update the status of the observed portion rather than marking the entire trace complete. In a repeat campaign, retain both the previsit plan and dated results so a later reviewer can distinguish expectation from coverage.

Consider two fictional teams that each add one hundred bank meters of effort. One repeats a reviewed interval after a changing water level; the other examines a new interval of the same length. The first adds no new unique geometry, but may supply important temporal evidence. The second extends the mapped coverage without creating a repeat observation. Reporting only the reach-wide total would erase part of the first team's work. Reporting only cumulative walk lengths would obscure what the second team added. Track revisit effort and new geographical support separately instead of giving one metric two incompatible jobs.

If another organization joins later, give it the exact bank convention, reference geometry and inclusion rules before combining its notes with yours. A new observer may use a meaning of left based on facing a trail rather than facing downstream, or measure the route instead of the bank interval. Test a shared fixture and compare support before aggregating. It is much cheaper to resolve different conventions while both teams can identify a specific landmark than after the notes have been blended into a generic total.

The final step is to carry forward a small map or text description of what evidence would close the remaining gaps. Some parts may need a clearer station definition; others need a compatible authorized observation. Mark a segment as uncertain if those conditions cannot be met. The ledger serves the next decision by making the missing part specific rather than encouraging somebody to report unverified coverage for the sake of a complete-looking map.

References

Frequently asked
What is One Bank Is Not a Whole River Reach about?
!Two differently colored survey tapes along an aerial river bend (generated illustration)
What should you know about use a river-relative side convention?
The terms left and right change meaning depending on where a person stands or faces. For this article, assign left and right while facing downstream. A person looking upstream would have each river-relative bank on the opposite side of their body. A crew walking downstream might see the river beside them rather than…
What should you know about set endpoints and say which line carries the length?
A reach is a defined portion of the river for the purpose of the study. Identify its endpoints with enough detail that another observer can locate them. These can be known station marks, suitable mapped coordinates with described precision, named features supported by a map, or a combination. If endpoints were chosen…
What should you know about reproduce the chart with 300, 200 and 500 bank meters?
The chart uses a fictional inventory, not field observations from USGS, EPA or any real river. After accounting for repeated or overlapping observations within each side, the left bank contributes 300 meters of unique inspected bank length. The right bank contributes 200 meters by the same definition. Because the…
What should you know about choose the denominator before calculating coverage?
“Coverage” can mean a proportion of intended bank length, a proportion of longitudinal stationing, a share of previously inventoried segments visited, or a fraction of designated observation points. Name the exact unit and intended universe before looking at the result. If the plan is to check both sides throughout a…
References & sources
  1. Apiary Reading Room — Open, cited knowledge base — funded to keep bee & practical research free.
From the Apiary Reading Room. Opinion & editorial — not financial advice. We don't overclaim.
More from the Reading Room